The Comprehensive Homeowner’s Hurricane Protection Checklist
A phase-by-phase safety guide for Fort Myers: maintenance two months out, staging at the Watch, deployment at the Warning, safety during the storm, and recovery after. Check items off — progress saves in this browser.
0% complete (0/30)
Your protection arsenal: quick facts
| System | Type | Quick-fact benefit |
|---|---|---|
| Roll-down shutters | Permanent / motorized | Maximum convenience; deployed instantly via button or smartphone. |
| Accordion shutters | Permanent / manual | Heavy-duty protection always attached; deploys in minutes. |
| Storm panels | Removable | Most affordable; high impact resistance in metal or polycarbonate. |
| Hurricane fabric | Removable / woven | Lightweight, missile-rated polypropylene; absorbs massive impacts. |
| Impact windows | Permanent / glass | 24/7 passive protection; resists 150 mph winds without external shutters. |
Phase 1 — Pre-season preparation (begin at least 2 months before hurricane season)
New Fort Myers installations typically take 2-6 weeks from signed agreement to completion — waiting for a Watch is a recipe for failure.
Maintenance & inventory
Professional vetting
Phase 2 — Hurricane watch (36-48 hours out — preparation)
A Watch means conditions are possible. Do “dry runs” while the weather is calm.
System staging & testing
Phase 3 — Hurricane warning (12-24 hours out — deployment)
A Warning means conditions are expected. Complete all deployment before tropical-storm-force winds arrive.
The deployment sequence
Final safety check
Phase 4 — During the storm (active safety)
Your home is a hardened sanctuary. Trust the equipment; prioritize personal safety.
Active safety protocols
Phase 5 — Post-storm recovery & inspection
Safe removal & storage
“Symptom check” damage assessment
Professional follow-up